Official Meeting Feedback Period: April 27 - May 26 | Learn More About I-35 Capital Express Program
02 Project Presentation and Information

Project Presentation and Information

The I-35 Capital Express South project spans eight miles of I-35 from SH 71/Ben White Boulevard to SH 45 Southeast. The project proposes to add two non-tolled high-occupancy vehicle managed lanes in each direction and improve safety and mobility throughout the corridor. The project will also reconstruct bridges, add pedestrian and bicycle paths, and make additional safety and mobility improvements within the project limits.

Managed lanes, such as high-occupancy vehicle (HOV) lanes, are lanes within a highway that are separated from the mainlanes, and access is controlled by placing restrictions on use. They are designed to provide a less congested route than adjacent general-purpose lanes during peak periods for qualifying vehicles. HOV lanes are reserved for the use of carpools, vanpools, transit vehicles and emergency responders.

Download the Presentation (PDF) Download the Fact Sheet (PDF)

 

Project Information

Project Layout

View Online Download PDF (40 MB)

Building Barriers to Traffic Noise Brochure

English Version (PDF) Spanish Version (PDF)

State Purchase of Right of Way

English Version (PDF) Spanish Version (PDF)

Landowner’s Bill of Rights

English Version (PDF) Spanish Version (PDF)

Relocation Assistance

English Version (PDF) Spanish Version (PDF)